Geotechnical Pile Foundation BD for Dummies
In this process, a circular gap is excavated up into the depth at which the soil will stand unsupported (about 0.5m for tender clay and 2m for rigid clay). Vertical boards known as laggings, are then established in posture around the excavated facial area and they are held tightly towards the soil by steel rings.The installation of pile foundations